← Stewardship & RFCs

APRF-RFC-0005 · accepted · MINOR · APRF v0.11.0

Demote reliability-continuity REL-M4 to recommended (REL-R3)

Demotes REL-M4→REL-R3 (process continuity options with owners); pre-release ID-removal exception.

Created 2026-08-01

FieldValue
Statusaccepted
Author(s)StackRail (working-draft publisher)
Created2026-08-01
SemVer impactMINOR
RelatedAPRF-RFC-0002, APRF-RFC-0003 (pre-release M→R pattern)

Problem

REL-M4 required every process marked critical-AI-dependent to have ≥1 documented continuity option with a named owner as a catalog mandatory (`must`). That over-weights process-level continuity documentation relative to production-blocking reliability gates already covered elsewhere:

Stronger / adjacent controlWhat it already proves
REL-M2Critical journeys define degraded mode when AI is unavailable, with failover-test evidence
REL-M6Business-critical AI services have numeric RTO/RPO linked to tested restore/failover
REL-M5Backups include AI control-plane artifacts needed to restore service
REL-M7 / REL-M8Chaos and continuity drills for higher-tier / regulated workloads

Documented continuity options with owners remain valuable operator maturity, but failing a catalog mandatory for missing a process register when journeys already degrade safely (REL-M2) and services have RTO/RPO (REL-M6) blocks assessments for the wrong reason. REL-M4 was never on Core or Regulated `mandatoryCheckIds`; keeping it as a catalog `must` still forces full-catalog and custom-gate consumers to treat documentation as a hard fail.

Proposal

1. Demote REL-M4 → REL-R3 (recommended `should` language; hybrid detection via `repo-ai-continuity-options` unchanged in substance).

2. Remove REL-M4 from the reliability-continuity mandatoryChecks list in `aprf-spec.json`; add REL-R3 under recommendedChecks.

3. Do not change Core (38) or Regulated (54) profile counts — REL-M4 was never listed there.

4. Pass condition unchanged in substance: 100% of critical-AI-dependent processes have ≥1 documented continuity option with a named owner; attest `measuredAt` ≤90d.

5. Keep REL-M1–M3, REL-M5–M8 as the reliability-continuity mandatory spine (timeouts, degraded mode, partial-failure outcome, backups, RTO/RPO, chaos/continuity drills as applicable).

Alternatives considered

- Soften passCondition but keep mandatory — rejected; still treats documentation coverage as a hard gate overlapping REL-M2/REL-M6.

- Demote in place (`gate: recommended` on REL-M4) — rejected; recommended Checks use the `*-R*` namespace.

- Merge into REL-M2 — rejected; journey degraded-mode + failover tests are not the same as a process-level owned continuity-options register.

- Merge into REL-M6 — rejected; RTO/RPO service objectives are not process continuity-option docs with owners.

Compatibility

ChangeImpact
REL-M4 removed; REL-R3 addedCatalog mandatory −1; recommended +1; total Checks unchanged (178)
Core / Regulated mandatoriesUnchanged (38 / 54)
Crosswalk / relatedRulesRemapped REL-M4 → REL-R3
Collector / plugin`ai-continuity-options` maps to REL-R3

SemVer: MINOR — M→R remapping while still on working-draft `0.10.x`.

Pre-release exception: no tagged release yet — REL-M4 YAML removed rather than deprecated stub. Recorded in `id-gaps.md`. After first tagged release, future demotions must use `deprecated` + `replacedBy`.

Security considerations

No weakening of runtime degraded mode (REL-M2), partial-failure outcome tests (REL-M3), backups (REL-M5), or RTO/RPO (REL-M6). Residual risk is thinner process-level ownership documentation; mitigated by keeping REL-R3 high-severity recommended with hybrid collectors and by retaining REL-M2/REL-M6 as mandatories where applicable.

Open questions

- Should Regulated later re-include process continuity-option documentation as an additional mandatory once Level-5 ops maturity is ratified?

- Should REL-R3 require periodic review of owners (≤90d) beyond documentation freshness?

Checklist

- [x] Problem and affected parties

- [x] Proposed change stated

- [x] SemVer impact justified

- [x] Compatibility / deprecation plan

- [x] Checks remain measurable

- [x] Crosswalk impact noted

- [x] Security / safety considered

- [x] Open questions listed


Comment window: 14 days from `Created` (working-draft quorum applies). Interim contact: see `/aprf/rfc/`.

Source markdown: /aprf/rfc/0005-reliability-continuity-rel-m4-to-recommended.md